Factory

In January 2001, SOGIP moved to its own 6000 sqm factory being spread out over 8300 sqm :

  • 800 sqm administration built in two floors with 20 offices, 1 showroom, 1 conference room, 1 multimedia office and 1 archives office.
  • 1500 sqm workshop divided in 4 areas to facilitate and simplify work and the saving of time and people. The material used is modern, simple and effective. Two modern and fully computerised machines are installed to satisfy the customer requirements of colours used in building or industrial sector.
  • 1200 sqm warehouse to stock a significant and diversified range of products.
  • 1500 sqm store of raw materials and packaging.
  • 1000 sqm car and trucks parking.
  • A laboratory of control, testing and R&D equipped with very advanced materials in which the engineers and the technicians control the production at its different stages, the raw material at the time of reception, enlarge the product range and improve the manufacturing process.